The original idea was based on a group of buildings with interlinked main areas and green spaces (in this first stage the offices and the packaging house were built). The first area consists of the offices, the training-dining room, the access control, and the different parking sectors; while the packing house, the services buildings, and the storage facilities are in the second area. The technical resolution was based on the use of flat concrete blocks for the buildings in the first group, and pure volumes of colored metal sheet for the ones in the second group.
Los Alamos de Rosauer | Cipolletti – Río Negro
Technical Data:
Date: 10/2005
Location: Cipolletti
Year: 2005
Area: 4.000 m2
- Construction management
- Project